Search returned 104 results

No Results Found.

Federal Title V - Part 70 Operating Permit Applications

Air Quality Permits Program

Federal Title V - Part 70 Operating Permit applies to major sources of air pollution and other significant sources of air pollution that are required by Title V of the federal Clean Air Act and Part 70 of the Code of Federal Regulations to obtain an initial Title V - Part 70 Operating Permit, amend or modify an existing Title V - Part 70 Operating Permit, or renew an existing Title V - Part 70 Operating Permit.

Details →
15-18  Months
$0

Fleet Inspection Station License

Mobile Sources Control Program

Required by any fleet in order to perform official Vehicle Emissions Inspection Program tests.

Details →
23  Days
$0

General Discharge Permit for Animal Feeding Operations

Animal Feeding Operations Program

<p> Animal Feeding Operation (AFO) means a feedlot or facility where: </p> <ul> <li> Non-aquatic animals are confined, fed, and maintained for at least 45 days in any 12-month period; </li> <li> Crops, vegetation, forage growth, or post-harvest residues are not sustained in the normal growing season over any portion of the lot or facility. </li> </ul> <p> AFOs may be required to apply for the General Discharge (GD) Permit for AFO. </p> <p>The classification as a Concentrated Animal Feeding Operation (CAFO) or Maryland Feeding Operation (MAFO) is determined by a combination of factors, including the number and type of animals, and whether the operation will discharge to waters of the State of Maryland. </p> <p>Any chicken (other than laying hens) AFO with dry manure handling and between 75,000 and 99,999 square feet total house capacity is considered a MAFO unless the owner/operator submits to MDE. </p> <p>Fees range from $0-$1200. New or expanding farms 350,000 square feet or larger must pay a one time fee of $2,000 </p>

Details →
6 - 36  Months
$0-$1200

General Discharge Permit for Discharges from Mineral Mines, Quarries, Borrow Pits, and Concrete and Asphalt Plants (MM) Notice of Intent (NOI)

Wastewater Program

The General Permit for Mineral Mines, Concrete and Asphalt Plants cover a variety of industrial activities and discharges. Part I of the permit provide the specific types of discharges and industries. Part II contains the application process, and the following Parts of the permit contain the required controls, monitoring and reporting. To review the permit you may find it at this <a href="https://mde.maryland.gov/programs/permits/WaterManagementPermits/Pages/amines.aspx"> link</a>. <br>In signing the NOI and the DOI (Declaration of Intent), paying the fee and providing the required plans you are certifying you will abide by the requirements of that permit.

Details →
100  Days
$0-2,875 (This is an annual fee)